Construction of New Telephone Exchange Building in Imphal
Part 1(Questions And Answers) · Unstarred Q.1061
His passages in this document (1)
Uncorrected OCR from the scanned volume. Check the original PDF before quoting.
- 1Prof. N. Tombi SinghSpeaker label in OCR:
SHRI N. TOMBI SINGH· 44 wordsWill the Minlsterof COMMUNICATIONS be pleased to state: (a) whether the construction of new telephone exchange building in Imphal has been completed; (b) if so, when the new telephone exchange is likely to start functionina; and (c) if not, the reasons for the delay?
The same passage is also filed under 1 other title
- Development of Tourism in Manipur Mizoram and Nagaland · 4 March 1991
Mentions of his name (1)
- 335 Written Answers MARCH 4,1991 Written AnSW9ts 336 Conatructlon of New Telephon. Ex· chang. Building In Imphal 1061. SHRI N. TOMBI SINGH: Will the Minlsterof COMMUNICATIONS be pleased to state: (a) whether the construction of new telephone exchange building in Imphal has been completed; (b) if so, when the new telephone exchange is likely to start functionina; and (c) if not, the reasons for the delay? THE DEPUTY MINISTER IN THE MIN
Full OCR text
Uncorrected OCR from the scanned volume. Check the original PDF before quoting.
Cite this
Plain text
Lok Sabha Debates, 9th Lok Sabha, Session VII, 4 March 1991, “Construction of New Telephone Exchange Building in Imphal”, speech by Prof. N. Tombi Singh, Lok Sabha Digital Library, https://elibrary.sansad.in/items/b63cb028-f643-4752-94ad-42a5a8dff6c1.
BibTeX
@misc{lsdl_b63cb028,
title = {{Construction of New Telephone Exchange Building in Imphal}},
author = {{Prof. N. Tombi Singh}},
howpublished = {Lok Sabha Debates, 9th Lok Sabha, Session VII},
year = {1991},
date = {1991-03-04},
publisher = {Lok Sabha Digital Library},
url = {https://elibrary.sansad.in/items/b63cb028-f643-4752-94ad-42a5a8dff6c1}
}Report an error in this record · ID b63cb028-f643-4752-94ad-42a5a8dff6c1